BZU PAGES: Find Presentations, Reports, Student's Assignments and Daily Discussion; Bahauddin Zakariya University Multan Right Header

HOME BZU Mail Box Online Games Radio and TV Cricket All Albums
Go Back   BZU PAGES: Find Presentations, Reports, Student's Assignments and Daily Discussion; Bahauddin Zakariya University Multan > Welcome to all the Students > Daily News And halat-e-hazra

Daily News And halat-e-hazra National & Intentional Daily News


Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
  #1  
Old 25-12-2007, 03:08 PM
.BZU.'s Avatar


 
Join Date: Sep 2007
Location: near Govt College of Science Multan Pakistan
Posts: 9,693
Contact Number: Removed
Program / Discipline: BSIT
Class Roll Number: 07-15
.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute.BZU. has a reputation beyond repute
Default Plan to push up power generation by 2700 MW

Plan to push up power generation by 2700 MW

ISLAMABAD: Following the completion of private sector projects, the generation of electricity in the country would go up by 2700 Megawatts.

Caretaker Minister for water and power, Tariq Hameed told the media that the Private Power Infrastructure Board has been directed to remove the obstacles in the way of the completion of hydel electricity generation projects so that the gap between the supply and demand could be abridged.

He said that the work on two projects of 286 MW has already started, while others were in their preliminary process. He said that 150 MW would be obtained from windmills in 2008, while 600 houses would be provided solar energy.
The Image of the Electric TowersName:  Plan to Push.jpeg
Views: 144
Size:  15.9 KB

__________________
(¯`v´¯)
`*.¸.*`

¸.*´¸.*´¨) ¸.*´¨)
(¸.*´ (¸.
Bzu Forum

Don't cry because it's over, smile because it happened
Reply With Quote
Reply

Tags
2700, generation, plan, power, push


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
What a Generation Gap .BZU. Funny Cut Piece 0 22-11-2011 09:17 PM
Inadequate Transport Facilities Push Students To Bus Rooftops Salman Mushtaq Daily News And halat-e-hazra 0 14-11-2011 12:27 PM
Download free beautiful Themes for Nokia 2690-2700 Classic .BZU. Mobile Stuff 0 10-09-2011 08:46 AM

Best view in Firefox
Almuslimeen.info | BZU Multan | Dedicated server hosting
Note: All trademarks and copyrights held by respective owners. We will take action against any copyright violation if it is proved to us.

All times are GMT +5. The time now is 11:01 AM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.