View Single Post
  #1  
Old 20-02-2009, 05:03 PM
usman_latif_ch's Avatar
usman_latif_ch usman_latif_ch is offline
Senior Member

 
Join Date: Sep 2008
Location: Lahore
Age: 41
Posts: 6,663
Contact Number: 03009441339, 03334146191
Program / Discipline: Engineering
Class Roll Number: BME-01083029 (The University Of Lahore)
usman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond reputeusman_latif_ch has a reputation beyond repute
Not Matter Engineering Math Question

Engineering Math Question
Conditions:
A trackhoe weighing 22 tons is on top of a lowboy trailer and heading east on Interstate 70 near Hays, Kansas .
The extended shovel arm is made of hardened refined steel and the approaching overpass is made of
commercial-grade concrete, re inforced with 1½ inch steel rebar spaced at 6 inch intervals in a crisscross pattern layered at 1 foot vertical spacing.
Solve:
When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?
(Assume no effect for headwind and no braking by thedriver...)
Extra Credit:
Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.
Yes, you can neglect friction.


Name:  download.jpg
Views: 200
Size:  40.3 KB

Name:  download_002.jpg
Views: 216
Size:  82.2 KB

Name:  download_003.jpg
Views: 221
Size:  62.0 KB



I couldn't solve it either......but who cares;
The driver was on his cell phone..................


Reply With Quote